Sewer Permit Applications

Sewer Permit Applications

Metro staff permits all new sewer construction that will be dedicated to Metro for operation and maintenance. New projects must meet Metro requirements prior to obtaining a permit to construct and all projects must follow Metro’s Construction Phase Requirements prior to being accepted into the system.  Metro staff also permits all new connections to the system. Click here to fill out a Sanitary Sewer Permit Application or click here to download an application to be completed and faxed to 864-277-4272.

Metro contracts with an outside contractor approved by the South Carolina Public Service Commission for the operations and maintenance of its pump stations.  Careful evaluation of expenses associated with the use of Metro in-house personnel and equipment for pipeline construction and pump station O&M concluded that an outside contract, with Metro over-site, was the cost effective solution.

Permitting for individual connections
To connect to the sanitary sewer line you must pay a new account fee to Renewable Water Resources (864-299-4000) and obtain a permit from Greenville County (864-467-7100). If there is a 6-inch lateral already stubbed out for connection, the County will inspect the 4-inch lateral. If you have to connect to the mainline, Metro will inspect the installation of the 6-inch lateral and the County will inspect the installation of the 4-inch lateral. We will provide information to give to your plumber with the details for construction. To connect, please call 864-277-4442.

Metro Connects

Contact

MetroConnects 120 Augusta Arbor Way Greenville, South Carolina 29605 864-277-4442 (t) 864-277-4272 (f) For Directions click HERE.